Skip to content
NewPublic API for your TMSEnterprise

Every load, planned before you book.

Paste the packing list and press Calculate. Cargo Marshal works out how many containers or trucks you need, and exactly where every item goes.

7-day Team trial · No credit card · Nothing to install

ProjectsHamburg → NingboSC-0417
Calculated in 31 ms

Packing list

ItemL × W × H mmkg eachQty
Crate1170 × 1170 × 1300300
Case1170 × 580 × 64090
Carton585 × 390 × 43014

Change the quantities and press Calculate. The real engine plans it again in your browser.

294 items · 10.8 t

Packing list3 lines · 294 pcs

  • Crate1170 × 1170 × 1300 mm · 300 kg
  • Case1170 × 580 × 640 mm · 90 kg
  • Carton585 × 390 × 430 mm · 14 kg

Equipment

40 ft HC
294 items · 10.8 t
U1 · 40 ft HC
Centre of gravity · 6 m
  • No overhang
  • Stacking rules kept
  • Payload within limit
  • All cargo loaded

ResultU1 of 1

Units
1 × 40 ft HC
Items loaded
294 / 294
Volume used
85.3%
Payload
10.8 t / 26.6 t
Centre of gravity
6 m · 1.1 cm off axis

Share linkTeam and up

The warehouse opens the plan on a phone and ticks off each step. View only, no account needed.

View onlyStep 1 of 3

Unit 1 · 40 ft HC

  • Excel & .xlsx import
  • English & German headers
  • mm, cm, inches
  • 20 ft
  • 40 ft
  • 40 ft HC
  • 45 ft HC
  • Curtain trailer
  • Mega trailer
  • Your own equipment
  • Mixed Units
  • Stacking rules
  • Centre of gravity
  • Keep-together groups
  • Share links
  • Dock checklist
  • Loading report PDF
  • REST API
  • Webhooks
  • Single sign-on

Product

From packing list to loaded truck, in one calm place.

Import the list, let the engine plan every Unit, adjust what you know better, and send the plan to the dock. No retyping, no drawings, no guessing at the quay.

See how it works

Paste the packing list

Copy the table from Excel or import the .xlsx. English and German headers are recognised, and units are read straight from them.

DescriptionLength (cm)Width (cm)Height (cm)Weight (kg)Pcs
Wooden crate11711713030016
Transport case11758649028
Carton58.5394314250
NameLengthcmWidthcmHeightcmWeightkgQty

6 of 6 columns recognised

Press Calculate

The engine works out how many Units you need, mixes equipment types, and checks every loading rule before you see the plan.

U1 · 40 ft HC85.6%

U2 · 40 ft HC67.6%

U3 · 20 ft66.2%

3 Units2 × 40 ft HC + 1 × 20 ft · solved in 793 ms

Lock and recalculateTeam and up

The engine proposes, the planner decides. Locked items stay put on the next run.

Share without accountsTeam and up

A view-only link for the client or the warehouse. Revoke it any time, with an optional expiry.

A checklist for the dock

The crew follows the plan step by step on any phone. No app, nothing to print.

Calculate from your TMSEnterprise

A public REST API with scoped keys and webhooks. Your systems get the same load plan your planners see.

curl -X POST https://www.cargomarshal.com/api/v1/load-plans/{id}/calculate \
  -H "Authorization: Bearer sc_live_…" \
  -H "Idempotency-Key: 6f1c2b7e-0d4a-4f8e"
→ 202 Accepted
{ "status": "queued" }

// webhook: calculate.completed, then GET /load-plans/{id}
{
  "units": [ /* 3 */ ],
  "itemCount": 410,
  "unloaded": []
}

A loading report with your name on itTeam and up

A PDF for the client and the crew: every Unit, every step, centre of gravity and checks, with your company's logo.

Built for

From the quote to the dock.

Forwarders, 3PLs and shippers each start from a different question. They all end up with the same load plan.

Freight forwarders

“Is it two 40s, or a 40 and a 20?”

Know the Unit count before you quote or book. One calculation mixes equipment types, and the client gets a plan they can check.

  • Mixed Units in one calculation
  • Sea and Road equipment, or your own
  • Branded loading reportTeam and up

3PLs & warehouses

“Will the crew load it the way it was planned?”

Send one link. The dock opens a step-by-step checklist on a phone: no account, no app, nothing to print.

  • View-only link, revocableTeam and up
  • Keep-together groups unload in one go
  • Lock items and recalculate around them

Shippers & exporters

“Can our ERP just ask?”

Your team pastes packing lists from Excel. Your systems call the public API. Both end up with the same load plan.

  • Paste from Excel or import .xlsx
  • Public REST API with scoped keysEnterprise
  • Same plan in the app and your systems

Enterprise

Ready for procurement, security and IT.

Single sign-on, a data processing agreement, and payment by invoice or purchase order. Questions from security or legal get a written answer.

Talk to sales

Sign in with your company account

SAML single sign-on with your identity provider. Roles decide who plans, who views, and who manages billing.

Paid the way your company pays

Annual contract, paid by invoice or purchase order. A data processing agreement is part of the plan.

  • Viewers are freeClients, drivers and the warehouse never need a paid seat.
  • Your data, exportableEvery project and load plan stays readable and exportable, even after a plan ends.
  • Links you controlView-only, revocable, with an optional expiry.
  • Answers in writingSecurity questionnaires and legal review, by a person.

Pricing

Public prices. Every calculation included.

Every plan includes unlimited projects and calculations. New organisations start on a 7-day Team trial.

Pro

For a solo planner.

$59/ month, billed yearly

$708 per year

Start free trial
  • Unlimited calculations, projects, and load plans
  • 1 planner seat. Viewers are free.

Your trial runs on Team. Choose Pro when it ends.

Team

Recommended

For the forwarding desk.

$99/ month, billed yearly

$1,188 per year

Start 7-day trial
  • Everything in Pro
  • 5 planner seats. Viewers are free.
  • Turn and inspect the load in 3D
  • Share load plans by link, no account needed
  • Your logo on the loading report

Enterprise

For multi-branch teams. Invoice or purchase order.

Custom

Annual contract, paid by invoice or purchase order.

Talk to sales
  • Everything in Team
  • 15 planner seats. Viewers are free.
  • Connect your own systems (API and webhooks)
  • Sign in with your company account (single sign-on)
  • Pay by invoice or purchase order
  • Data processing agreement (DPA)

No credit card for the trial. Prices in USD.

Questions

Asked often.

Something else? Write to us, a person answers.

Our packing lists live in Excel. Do we retype them?

No. Paste the table or import the .xlsx. Cargo Marshal maps the columns, recognises English and German headers, and reads units from them: mm, cm, m, inches or feet, and kg, t or lb for weight. You check the mapping before anything is imported.

Can we see it before signing up?

Yes. Open the sample load plan to see the 3D view and the checklist the warehouse gets. No account needed.

Do we need a credit card for the trial?

No. The 7-day Team trial starts when you create your organisation. No card, and nothing is charged automatically.

What happens after the 7 days?

Nothing is charged. Your workspace turns read-only: you can still open and export every project and load plan, but not edit or calculate until you choose a plan.

Which plan do we need?

Pro: 1 planner seat. Team: 5 planner seats, adds turn and inspect the load in 3D, share load plans by link, no account needed, your logo on the loading report. Enterprise: 15 planner seats, adds connect your own systems (API and webhooks), sign in with your company account (single sign-on), pay by invoice or purchase order, data processing agreement (DPA).

Does the warehouse need an account?

No. A share link opens the checklist and the loading report in any browser. Visitors can view but not change anything.

What if our trailers aren't standard?

Add your own equipment types: inner length, width and height, door and side openings, payload and empty weight. They work everywhere the built-in ones do.

Does it replace our TMS?

No. Cargo Marshal plans the load. On Enterprise, your TMS or ERP calls the public API and gets the same plan back.

Plan your next load before lunch.

Bring one real packing list. You'll have a load plan to share in under ten minutes.